. transmissions are delivered to the fabrication line four at a time. it takes one hour for transmissions to be delivered. approximately four vehicles are produced each hour, and management has decided that 50 percent of expected demand should be maintained as safety stock. how many kanban card sets are needed?
Get the answer
Category: womensstudies |
Author: Valko Tomer
Related Questions
. trisha walked ofa mile to school.she shaded a model to show how fa

. trisha walked of a mile to school.she shaded a model to show how fa

. tucker is making emergency kits to share with friends. he has 20 bot

Category
literature
. two left feet ltd produces and sells a single product, the claud at shs.500. the unit manufacturing cost of claud is shs.200 and total fixed manufa
business
. two birds are flying toward a birdhouse that is halfway between them. the birds are at coordinates a (-9, 1) and b (5,-5). what are the coordinates
biomedicalengineering
. two cans, one weighing 6 pounds and one weighing 6 ounces, were dropped from 50 feet off the ground. if there is no air resistance which one hits th